FREQUENTLY ASKED QUESTIONS

What makes the Veltrix LOTOTO system different?

It is built on a structured system:

  1. Routine LOTOTO for standard operations
  2. ACP (Alternative Control Procedure) for short, repetitive tasks (e.g. doors, guards)
  3. FS (Task-Specific Procedure) for defined maintenance activities

Each procedure defines:

  1. what can be done
  2. which energy sources are required
  3. which must be isolated

This ensures safe execution — not just compliance.

How long does it take to implement a LOTOTO system?

It depends on several factors:

  1. the complexity of the machinery or production line
  2. the number of energy sources involved
  3. the availability and cooperation of internal specialists

Each project is planned with a clear structure and timeline — from assessment to full implementation.

Is it possible to request a quote online?

Yes — but real systems require real assessment.

Most projects need an on-site evaluation

to fully understand the complexity and risks.

However, we can start online —

to define scope, expectations, and next steps.

Request Checklist Pack

Címünk: 5600 Békéscsaba, Franklin utca 149.

Telefon: +36702729071 E-mail: safetyfirstbau@gmail.com

Tell us about your system and we’ll send you the LOTOTO Checklist Pack.